A. James Clark Hall on September 24th, 2020 (Overall) |
Inside lobby of Clark Hall (Detail) |
The maker space of Clark Hall (Medium) |
An engineering lab room (Medium) |
Tools in the engineering lab (Detail) |
A. James Clark Hall on September 24th, 2020 (Overall) |
The pipes on the ceiling of Clark Hall (Detail) |
No comments:
Post a Comment